For detailed information, other images and documents, please select individual articles from the following table.
GIS washbasin installation box
Completely pre-installed box for rapid installation and easy pipe feedthroughs
Register now and access more than 125,000 products
Variants
Register now and access more than 125,000 products
- For millimetre-precise and secure installation so as to ensure optimal sound insulation
- Easy mounting - quick and tool-free mounting using GIS profile connectors
- Huge time savings - pipe ducts are completely pre-assembled and ready for connection
- The enlarged and elegant wall panels increase the accuracy of the wall connection
- Tested with maximum dimensional accuracy
- Drywall can be sealed immediately
- The plaster and tile base boards ensure a permanently stable substrate
- Optimum insulation
- Stable substrate
Makes working practices easier
- Prevents unevenness during tiling work
- No corrosion
- Protection against condensation water
Please state the desired pipe system when ordering.
The following information is required:
Pipe manufacturer: e.g. Viega
Pipe type: e.g. Raxofix
Your order cannot be processed without this information.
Custom production. Extended delivery times (maximum 7 working days).
These products cannot be exchanged or returned. Each order is manufactured individually to the customer's specifications
For plumbing installations in dry walling
1. The dry walling company must secure the floor rail and roof rail. Only loosely insert the vertical GIS profiles into these rails (do not secure).
2. The installer arranges the installation depending on the design type and determines the appropriate installation height. Insert the installation boxes between the two GIS profiles, align horizontally and attach using GIS profile connectors.
3. Lastly, secure a vertical GIS profile to the floor so that the installation box can no longer be moved.
Select RAL-colour code
!! NOTE: On-screen visualisation of the colour differs from real colour shade!!